-
Notifications
You must be signed in to change notification settings - Fork 2
feat(algorithms, intervals): count days without meetings #128
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
Conversation
|
Warning Rate limit exceeded@BrianLusina has exceeded the limit for the number of commits that can be reviewed per hour. Please wait 24 minutes and 58 seconds before requesting another review. ⌛ How to resolve this issue?After the wait time has elapsed, a review can be triggered using the We recommend that you space out your commits to avoid hitting the rate limit. 🚦 How do rate limits work?CodeRabbit enforces hourly rate limits for each developer per organization. Our paid plans have higher rate limits than the trial, open-source and free plans. In all cases, we re-allow further reviews after a brief timeout. Please see our FAQ for further information. 📒 Files selected for processing (2)
📝 WalkthroughWalkthroughAdds a new "Count Days Without Meetings" algorithm (two implementations), documentation, and tests under algorithms/intervals/count_days; also minor refactor in merge intervals to use explicit interval variables for clarity. Changes
Estimated code review effort🎯 3 (Moderate) | ⏱️ ~25 minutes Possibly related PRs
Poem
Pre-merge checks and finishing touches❌ Failed checks (1 warning)
✅ Passed checks (2 passed)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
Actionable comments posted: 5
🧹 Nitpick comments (1)
algorithms/intervals/merge_intervals/__init__.py (1)
24-37: Consider minor optimization to reduce redundant checks.The refactoring improves code clarity by introducing intermediate variables. However, there's a minor optimization opportunity:
- Line 27 computes
last_merged_interval_end_timeon every iteration, even when it was just used in line 36.- The
not mergedcheck on line 30 is redundant sincelast_merged_interval_end_timeis-infwhenmergedis empty, which naturally satisfies the condition.🔎 Optional refactor for efficiency
for interval in closed_intervals: current_interval_start_time = interval[0] current_interval_end_time = interval[1] - last_merged_interval_end_time = merged[-1][1] if merged else float("-inf") # if the merged array is empty or the last interval in the merged array does not overlap with the current interval - if not merged or last_merged_interval_end_time < current_interval_start_time: + if not merged or merged[-1][1] < current_interval_start_time: # add it to the merged list merged.append(interval) else: # else we merge the intervals, by updating the max end time of the last interval in the merged list merged[-1][1] = max( - last_merged_interval_end_time, current_interval_end_time + merged[-1][1], current_interval_end_time )This eliminates the intermediate variable that's only used once per branch and removes the redundant
not mergedcheck.
📜 Review details
Configuration used: defaults
Review profile: CHILL
Plan: Pro
⛔ Files ignored due to path filters (15)
algorithms/intervals/count_days/images/examples/count_days_without_meetings_example_1.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/examples/count_days_without_meetings_example_2.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/examples/count_days_without_meetings_example_3.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_1.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_10.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_11.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_12.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_2.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_3.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_4.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_5.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_6.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_7.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_8.pngis excluded by!**/*.pngalgorithms/intervals/count_days/images/solutions/count_days_without_meetings_solution_9.pngis excluded by!**/*.png
📒 Files selected for processing (5)
DIRECTORY.mdalgorithms/intervals/count_days/README.mdalgorithms/intervals/count_days/__init__.pyalgorithms/intervals/count_days/test_count_days_without_meetings.pyalgorithms/intervals/merge_intervals/__init__.py
🧰 Additional context used
🧬 Code graph analysis (1)
algorithms/intervals/count_days/test_count_days_without_meetings.py (1)
algorithms/intervals/count_days/__init__.py (2)
count_days(4-54)count_days_2(57-84)
🪛 LanguageTool
algorithms/intervals/count_days/README.md
[style] ~45-~45: Using many exclamation marks might seem excessive (in this case: 11 exclamation marks for a text that’s 3203 characters long)
Context: ...t_days_without_meetings_solution_1.png)

🪛 markdownlint-cli2 (0.18.1)
DIRECTORY.md
104-104: Unordered list indentation
Expected: 2; Actual: 4
(MD007, ul-indent)
105-105: Unordered list indentation
Expected: 4; Actual: 6
(MD007, ul-indent)
🔇 Additional comments (2)
algorithms/intervals/count_days/test_count_days_without_meetings.py (1)
1-525: LGTM! Comprehensive test coverage.The test file is well-structured with:
- Excellent edge case coverage including boundary conditions (0 free days, maximum constraints)
- Both
count_daysandcount_days_2tested with identical test cases for consistency- Proper use of parameterized testing to reduce duplication
- Clean organization with 9 test cases ranging from simple to complex scenarios
DIRECTORY.md (1)
104-105: LGTM! Documentation properly updated.The new "Count Days" entry is correctly added to the Intervals section with proper indentation and linking. The indentation is consistent with the rest of the file structure.
Note: The static analysis hints about indentation are false positives - the indentation follows the established pattern used throughout the file.
Co-authored-by: coderabbitai[bot] <136622811+coderabbitai[bot]@users.noreply.github.com>
Co-authored-by: coderabbitai[bot] <136622811+coderabbitai[bot]@users.noreply.github.com>
Co-authored-by: coderabbitai[bot] <136622811+coderabbitai[bot]@users.noreply.github.com>
Co-authored-by: coderabbitai[bot] <136622811+coderabbitai[bot]@users.noreply.github.com>
Describe your change:
Count days without meetings interval algorithm problem
Checklist:
Fixes: #{$ISSUE_NO}.Summary by CodeRabbit
New Features
Documentation
Tests
Refactor
✏️ Tip: You can customize this high-level summary in your review settings.